04 — Renovation

Kitchen renovation in Dubai

A kitchen renovation touches every trade at once: demolition, water and drainage, electrical for appliances, tiling, ceiling and lighting, cabinetry and paint. The company runs those in sequence on one programme, and has recent kitchen jobs in villas and apartments across Dubai including backsplash tiling in JVC.

Office carpet tiles being fitted
Office carpet tiles being fitted · April 2026 · company site photo

What the job includes

  • Strip-out of old cabinets, worktops, tiles and appliances
  • Plumbing alterations for sink, dishwasher and washing machine positions
  • Electrical points for hob, oven, extraction and sockets
  • Wall and floor tiling, including backsplash
  • Gypsum ceiling, bulkheads and lighting
  • Cabinet and worktop installation coordinated with the joinery supplier
  • Painting and final clean

What changes the quotation

So the estimate makes sense before the site visit.

  • Whether the layout changes — moving the sink or hob adds plumbing and electrical
  • Cabinetry: supplied by the company's joinery partners or by the client
  • Tile size and material for floor and backsplash
  • Occupied home versus empty unit, and tower access rules

Related work by the company

Site photographs from the crews. Captioned by trade and month.

Related work

Office carpet tiles being fitted
Office carpet tiles being fitted · April 2026
Office carpet tiles being fitted
Office carpet tiles being fitted · April 2026
Villa extension, structural stage
Villa extension, structural stage · March 2026
Villa extension, structural stage
Villa extension, structural stage · March 2026
Villa extension, structural stage
Villa extension, structural stage · March 2026
Villa extension, structural stage
Villa extension, structural stage · March 2026

Questions we get asked

How long is the kitchen out of use?

From strip-out to a working sink and hob is typically a couple of weeks; cabinetry lead time is the biggest variable and is confirmed before strip-out so the gap stays short.

Do you supply the kitchen cabinets?

Cabinets and worktops are done through the company's joinery partners or installed from your own supplier. Either way the plumbing, electrical, tiling and ceiling are by the company's crews.

Can the old tiles stay?

If they are sound and the new layout does not move services, new tiles can sometimes go over them. Where drains move, the floor is opened anyway.

Have kitchen renovation work?

Send photos and the approximate area on WhatsApp, or call. For larger jobs the next step is a site visit to measure and quote.

Call WhatsApp